Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Please Leave Us A Message
Mine, mine section
|
Mining geological conditions
|
Mining method
|
||||
inclination
(°)
|
thickness
(m)
|
Surrounding rock
|
Lower wall rock
|
ore
|
||
Tongguanshan Copper Mine, Old Temple Base, a Taihou Body-55~-135 Pillar
|
60~72
|
13~15
|
Marble, stable
|
Skarn, stable
|
Magnetic iron ore containing copper quartzite, stable
|
Retaining method, stage mining method
|
35m positive and negative 22nd pillar of Xiaotongguanshan Copper Mine
|
60
|
twenty three
|
Flash feldspar , stable
|
Shale shale , stable
|
Copper-bearing skarn, stable
|
Filling method
|
Shouwangfen Copper Mine 011,0101 pillar
|
70
|
15
|
stable
|
stable
|
Iron ore, stable
|
Stage mining method
|
1618 ore body of Beishankeng, Huatong Copper Mine
|
65~75
|
12
|
Dolomitic marble , solid
|
Granite , stable
|
Copper-bearing skarn, copper-bearing magnetite, stable
|
Retaining method
|
Huatong Copper Mine 1673 ore body
|
Sharp tilt
|
18
|
Ibid.
|
Ibid.
|
Copper-bearing skarn
|
Retaining method
|
Jinling Iron Mine
|
50
|
6 to 8 to
15~30
|
Limestone,
f=8
|
Diorite , stable
|
Magnetite, medium stability
|
Sectional rock drilling stage mining method
|
The pillar of the No. 10 and No. 11 ore blocks of the 4th stage of the Tongmin Copper Mine
|
55-65
|
15~17
|
Falling snow dolomite , stable
|
Due to the purple layer of the people, the stability is poor
|
Copper mine, stable
|
Ibid.
|
Inuit copper mine monkey jumping rock 2-5 pillar
|
60~75
|
4~27
|
Ibid.
|
Ibid.
|
Ibid.
|
Ibid.
|
Dongchuan Copper Mine
|
80~85
|
8~12
|
Conglomerate, stable
|
Incumbent purple sandstone , stable
|
Incumbent purple sandstone, stable
|
Ibid.
|
The Dongchuan Copper Mine falls into the snow-scarred southern section of the 3rd and 4th stages of 9 ore pillars
|
85~88
|
17
|
Sandy slate
|
Iron slate
|
Iron slate
|
Ibid.
|
Yangjiazhangzi Copper Mine No. 5 ore body - 230 stage 3~6 ore pillar
|
50~60
|
6-8
|
Limestone, medium stability
|
Limestone, medium stability
|
Angular rock, skarn-type molybdenite
|
Empty field method
|
No. 3 and No. 4 ore body of Fenghuangshan Copper Mine
|
Sharp tilt
|
8.9, 10.2
|
Medium stability
|
Medium stability
|
Medium stability
|
Retaining method
|
Tianbaoshan lead zinc ore
|
50~85
|
4~23
|
Marble is stable
|
Stable skarn, diorite
|
Stable copper-lead-zinc skarn
|
Retaining method
|
Mine, mine section
|
Pillar mining
|
Collapsing amount
(10,000 tons)
|
Main technical and economic indicators of pillar recovery
|
Remarks
|
|||||
Mining method
|
Scale order
|
Ore loss rate /%
|
Ore depletion rate /%
|
Mining ratio m/kt
|
Mine strength ton / Taiwan · day
|
Unit explosive consumption kg/t
|
|||
Tongguanshan Copper Mine, Old Temple Base, a Taihou Body-55~-135 Pillar
|
III
|
Two stages of several nugget columns in two stages collapsed
|
13.97
|
11.6
|
18.5
|
9.66
|
250~300
|
0.42
|
Release the filling of one of the mines and then recover. Large block rate is 15-20%
|
35m positive and negative 22nd pillar of Xiaotongguanshan Copper Mine
|
II
|
After releasing the filling, the two pillars collapsed once.
|
44.1
|
28.4
|
17.2
|
16.2
|
180~250
|
0.55
|
At the same time, topping; it is difficult to release the filling, not promoted
|
Shouwangfen Copper Mine 011,0101 pillar
|
I
|
Immediately after mining
|
|
5
|
17
|
10.6
|
|
0.23
|
The bulk output rate is 18.3%
|
1618 ore body of Beishankeng, Huatong Copper Mine
|
I
|
Two stages of the pillar collapse once
|
|
10~15
|
15~20
|
|
|
0.12~0.15
|
Blind ore body
|
Huatong Copper Mine 1673 ore body
|
I
|
Two columns collapsed once
|
|
9.7
|
14.8
|
|
|
0.15
|
The consumption of secondary explosive is 0.4kg/t; it is blind ore body
|
Jinling Iron Mine
|
II
|
The column is detonated before the top column
|
|
46
|
|
2.36
|
|
|
The inclination angle is not steep, and the recovery index of the upper plate is not good.
|
The pillar of the No. 10 and No. 11 ore blocks of the 4th stage of the Tongmin Copper Mine
|
II
|
Two ore pillars collapsed once
|
15.61
|
11.76
|
10.52
|
|
|
0.525
|
|
Inuit copper mine monkey jumping rock 2-5 pillar
|
III
|
Fragmentation, the maximum explosive amount does not exceed 35t
|
|
|
|
|
|
0.5
|
Preventing blasting earthquakes from causing surface rolling stones
|
Dongchuan Copper Mine
|
II
|
One blasting of four ore pillars
|
18.019
|
10.31
|
|
|
|
|
The blastholes are staggered, the two columns are broken and cannot be blasted in several stages.
|
The Dongchuan Copper Mine falls into the snow-scarred southern section of the 3rd and 4th stages of 9 ore pillars
|
II
|
Two stages of 9 ore pillars collapsed once
|
39.8
|
21.51
|
12.24
|
|
|
0.33
|
Rock migration area, demanding the foothills as soon as possible to eliminate security threats
|
Yangjiazhangzi Copper Mine No. 5 ore body - 230 stage 3~6 ore pillar
|
II
|
Partial recovery
|
0.59
|
80.6
|
28
|
|
|
0.5
|
The exposed area of the empty area is large and the time is long. The pillar has partially fallen and ruptured.
|
No. 3 and No. 4 ore body of Fenghuangshan Copper Mine
|
II
|
a pillar that blasts several ore blocks at a time
|
|
32.92
|
16.57
|
|
180
|
|
Loss of depletion has been calculated on 72t pillars
|
Tianbaoshan Lead-Zinc Mine
|
I
|
First column, rear top column
|
|
5
|
18~20
|
|
|
|
|
October 09, 2024
September 24, 2024
Envoyer à ce fournisseur
October 09, 2024
September 24, 2024
May 14, 2024
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.